
Challenge under budget & under stress solutions for Pine Mountains (World 1).
100% Pine Mountains Solutions
1-1: Ten Meter Simple Bridge
All springs are stretched except the one labelled “cmpr” is compressed.

1-2: A New Slope

1-3: Bridge of Steel

1-4: Fourteen Meter Overpass

1-5: Checkpoints

1-6: First Drawbridge
Hydraulic is expanding by 50%.

1-7: Taxi Task
There’s a tiny piece of wood connecting the road at the left side.

1-8: Rope Support

1-9: Budget Cuts

1-10: First Jump
All springs are compressed, non-marked springs are neutral.

1-11: Stop N’ Go
Both hydraulics are expanding by 50%.

1-12: Rock Rest

1-13: Redraw
Both larger hydraulics expand by 50%, both of the smaller hydraulics contract by 50%.

1-14: Land Brace

1-15: Hydraulic Management

1-16: Large Bridge

Be the first to comment