Derail Valley – Guide to Recommended Tonnage for Leaving Coalmine

Recommended tonnage of each train + diesel-electric trains with a slug going up Coalmine’s incline with no run-up.

Recommended Tonnage for Leaving Coalmine

Сrеdit gоеs to Tavish!

Recommended Tonnage

  • [DE2] 120 tons
  • [DE2+Slug] 260 tons
  • [S060] 440 tons
  • [DM3] 560 tons
  • [DH4] 560 tons
  • [S282] 780 tons
  • [DE6] 910 tons
  • [DE6+Slug] 1740 tons

These are all just the approximate maximum tonnage and you may be able to do more if you gain speed before the incline.

Testing Method

When testing I used Nuclear Fuel Carts as my wagons, never went into red, and never used sand. I’m not a pro at using steam locos, so you may be able to pull more with them.

Here is where I started every train at in the Coal Mine.

Every train had to get all the wagons across the bridge to pass.

Exact Testing Results:

  • [DE2] 1 Loaded 1 Unloaded 122 tons
  • [DE2+Slug] 3 Loaded 261 tons
  • [S060] 5 Loaded 435 tons
  • [DM3] 6 Loaded 1 Unloaded 557 tons
  • [DH4] 6 Loaded 1 Unloaded 557 tons
  • [S282] 9 Loaded 783 tons
  • [DE6] 10 Loaded 1 Unloaded 905 tons
  • [DE6+Slug] 20 Loaded 1740 tons
Egor Opleuha
About Egor Opleuha 7631 Articles
Egor Opleuha, also known as Juzzzie, is the Editor-in-Chief of Gameplay Tips. He is a writer with more than 12 years of experience in writing and editing online content. His favorite game was and still is the third part of the legendary Heroes of Might and Magic saga. He prefers to spend all his free time playing retro games and new indie games.

Be the first to comment

Leave a Reply

Your email address will not be published.


*